Sign In | Join Free | My gimpguru.org
China Xcell Energy  Equipment (Suzhou) Co., Ltd. logo
Xcell Energy Equipment (Suzhou) Co., Ltd.
Xcell Energy Equipment (Suzhou) Co., Ltd.
Verified Supplier

1 Years

Home > Cooling Tower Fills >

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Xcell Energy Equipment (Suzhou) Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Brand Name : BAC

Model Number : BAC cooling tower parts

Certification : SGS

Place of Origin : Jiangsu, China

MOQ : 1 Set

Price : Negotiated

Payment Terms : T/T

Supply Ability : 1000m2/per pay

Delivery Time : 7 Days

Packaging Details : Regular packaging/customizable

Condition : New

Cooling Type : Cooling Tower Parts

Material : PVC,CPVC

Warranty : 1 Year

Name : BAC cooling tower fill

Width : 1300mm

Usage : Cooing Tower

Thickness : 0.38-0.6mm

Sheet Spacing : 20mm

Length : 2440mm/customized

Contact Now

BAC Cooling Tower Filler | Cooling Tower Heat Dissipation Film

Specifications:

Tech Date
Sheet Width(mm) 1300mm
Sheet Length 2440mm/customized
Thickness 0.38-0.6mm/customized
Sheet Spacing 20mm
Color grey/black

The principle of operation of cooling tower fill is to put as much water surface area in contact with as much air as possible, for the longest amount of time possible. Film fills allow the water to form thin flowing sheets to expose as much water surface area as possible to the interacting flow.
Cooling tower sheet fills or media, come in many different forms and "micro-structures," each having unique characteristics to fit various applications. Film fills are selected for direct replacement, performance enhancement, and water condition compatibility. Each fill has performance characteristics that allow selections to be made for various heat loads, flow rates, water quality, and horse power combinations.

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Related Cooling Tower Film Fill

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

FAQ

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.


Product Tags:

BAC Cooling Tower Fill

      

BAC Cooling Tower Fill Replacement

      

Cooling Tower Heat Dissipation Film

      
Quality BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film wholesale

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xcell Energy Equipment (Suzhou) Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)